Getting Factory Automation Right (The First Time)

Title: Getting Factory Automation Right (The First Time)
Author: Edwin Zimmerman
ISBN: 0872635260 / 9780872635265
Format: Hard Cover
Pages: 268
Publisher: SME
Year: 2001
Availability: In Stock

Tab Article

Written largely for project managers charged with bringing automation into an existing facility, this comprehensive work takes readers through the countless steps of evaluating whether automation is needed, ways to plan the project, assembling the team, and overseeing the engineering, construction, and testing of equipment.

Chapters include detailed discussions on : choosing an approach to the project, equipment grades, levels, and justification, describing equipment performance and configuration, builder performance and validation criteria, the RFP letter, selecting the builder, managing the project, qualification and shipping, and system acceptance.

In addition, the book contains a valuable CD-ROM with interactive spreadsheets and the text of equipment specifications that will help readers get the most from the book. The CD files can be saved as templates to be re-used for each new automation project. Readers can do their own project justifications by the conventional payback and return-on-investment methods, configure the statistical quality calculations for process validation, then print out the results.

Tab Article

Preface
A Few Words About Ethics

Section 1 : Groundwork for The Acquisition Project
Chapter 1 : Determining the Need for Automation
Chapter 2 : Choosing an Approach to the Project
Chapter 3 : Assembling the Team
Chapter 4 : Equipment Grades and Levels, and Justification

Section 2 : Equipment Specifications
Chapter 5 : Describing Equipment Performance and Configuration
Chapter 6 : Builder Performance and Validation Criteria
Chapter 7 : The Request for Proposal Letter

Section 3 : Project Execution
Chapter 8 : Selecting a Builder and Placing the Order
Chapter 9 : Managing Project Execution

Section 4 : Equipment Validation and Project Closure
Chapter 10 : Qualification and Shipping
Chapter 11 : System Acceptance and Project Closure
Chapter 12 : In Spite of Due Diligence

Appendix A : Glossary of Terms
Appendix B : References and Recommended Reading
Appendix C : CD-ROM File Instructions
Index