Tab Article
Co-Operating Organisations
Preface and Scope
Introduction
Part 1 : Initial Verification
Chapter 1.1. : The General Requirements
Chapter 1.2. : Initial Inspection
Chapter 1.3. : Initial Testing
Part 2 : Periodic Inspection and Testing
Chapter 2.1. : The General Requirements
Chapter 2.2. : Periodic Inspection
Chapter 2.3. : Periodic Testing
Part 3 : Reference Tests
Chapter 3.1. : The Sequence of Tests
Chapter 3.2. : Continuity of Protective Conductors
Chapter 3.3. : Insulation Resistance
Chapter 3.4. : Protection by Separation of Circuits
Chapter 3.5. : Protection by Barriers or Enclosures
Chapter 3.6. : Protection by A Non-Conducting Location
Chapter 3.7. : Polarity
Chapter 3.8. : Earth Electrode Resistance
Chapter 3.9. : Earth Fault Loop Impedance
Chapter 3.10. : Functional Testing
Part 4 : Test Instrument Requirements and Precautions
Chapter 4.1. : Instrument Standard
Chapter 4.2. : Instrument Accuracy
Chapter 4.3. : Low Resistance Ohmmeters
Chapter 4.4. : Insulation Resistance Ohmmeters
Chapter 4.5. : Applied Voltage Testers
Chapter 4.6. : Earth Fault Loop Impedance Testers
Chapter 4.7. : Earth Electrode Resistance Testers
Chapter 4.8. : RCD Testers
Part 5 : Forms
Chapter 5.1. : Initial Inspection and Testing
Chapter 5.2. : Minor Works
Chapter 5.3. : Periodic Inspection
Appendix A : Resistance of Copper and Aluminium Conductors
Appendix B : Maximum Permissible Measured Earth Fault Loop Impedance
Index