- Description
- Feature
- Contents
A consideration of the problems of testing and adjustment of combustion processes, furnaces and furnace devices and internal hydrodynamics of boiler elements operating under pressure. The authors describe the specifics of the working process that may cause complications in operation.
• Methods of Steam Boiler Testing
• Sampling and Sample Preparation of Fuels and Ash Residues
• Analysis of Measuring Errors and Processing of Test Results
• Processing of the Results of Steam Boiler Testing
• Testing and Adjustment of Pulverizing Systems and Equipment
• Examination of Aerodynamic Characteristics of Furnaces. Adjustment of Burners
• Adjustment of Furnace Conditions
• Investigation of Combustion Process in Furnace
• Examination of Firewide Deposits
• Investigation of Erosive and Corrosive Wear of Heating Surfaces
• Investigation of Temperature Nonuniformities and Stresses in Boiler Drums
• Testing and Adjustment of Free Circulation Circuits of Boilers
• Testing and Adjustment of Water Walls of Once-through Boilers
• Testing and Adjustment of Steam Superheaters
• Testing and Adjustment of Convective Economizers, Steam Pipelines and Fittings
• Thermochemical Tests and Chemical Washing of Boilers
Chapter 1 : Methods of Steam Boiler Testing
Chapter 2 : Sampling and Sample Preparation of Fuels and Ash Residues
Chapter 3 : Analysis of Measuring Errors and Processing of Test Results
Chapter 4 : Processing of the Results of Steam Boiler Testing
Chapter 5 : Testing and Adjustment of Pulverizing Systems and Equipment
Chapter 6 : Examination of Aerodynamic characteristics of Furnaces
Chapter 7 : Adjustment of Furnace Conditions
Chapter 8 : Investigation of Combustion Process to Furnace
Chapter 9 : Examination of Fireside Deposits
Chapter 10 : Investigation of Erosive and Corrosive Wear of Heating Surfaces
Chapter 11 : Investigation of Temperature Nonuniformities and Stresses in Boiler Drums
Chapter 12 : Testing and Adjustment of Free Circulation circuits of Boilers
Chapter 13 : Testing and Adjustment of Water Walls of Once through Boilers
Chapter 14 : Testing and Adjustment of Steam Superheaters
Chapter 15 : Testing and Adjustment of Convective Economizers, Steam Pipelines and Fittings
Chapter 16 : Thermochemical Tests and Chemical Washing of Boilers