Construction Health and Safety in Coastal and Maritime Engineering

Title: Construction Health and Safety in Coastal and Maritime Engineering
Author: Ian Cruickshank, Stephen Cork
ISBN: 0727733451 / 9780727733450
Format: Soft Cover
Pages: 176
Publisher: Thomas Telford
Year: 2005
Availability: Out of Stock

Tab Article

Over £500 million is spent on coastal and maritime construction in the UK every year. This work is particularly hazardous due to the hostile environment and uncertainty caused by the combination of storms, waves, currents and tides. At present, there is little health and safety related guidance available to assist coastal/maritime clients, designers, contractors and other stakeholders to ensure this work is undertaken in a safe manner. The CDM Regulations, amongst others regulations, require these parties to consider and assess construction risks.  Without information and guidance on safe practice in the marine environment, it is not only difficult to undertake safety assessments but these assessments may be misguided and incorrect.

HR Wallingford, in detailed consultation with a wide range of design engineers, clients and contractors have lead a research project to address these issues. This guidance document has now been produced to cover best practice in safety management of coastal and maritime design and construction work.

The document identifies and analyses the principal causes of accidents in the coastal/maritime engineering sector and contains relevant guidelines for good practice to assist all stakeholders to understand and address the real safety risk issues and promote best practice in the coastal/maritime engineering sector.

Tab Article

Preface

Chapter 1 : Introduction
Chapter 2 : The Regulatory Environment
Chapter 3 : Review of Accidents in Coastal and Maritime Construction
Chapter 4 : Key Hazards and Other Risk Issues in Coastal and Maritime Engineering
Chapter 5 : Plant and Operational Issues
Chapter 6 : Protecting The Operatives, Users and Public
Chapter 7 : Good Practice Principles to be Applied During Each Project Phase

Acknowledgements
References
Appendices
Appendix
Index