ReducedEffort Changeover : The Lean Way to Quickly Reduce Changeover Downtime, 2nd Edition

Title: ReducedEffort Changeover : The Lean Way to Quickly Reduce Changeover Downtime, 2nd Edition
Author: Ron Heiskell
ISBN: 0367408902 / 9780367408909
Format: Soft Cover
Pages: 192
Publisher: Productivity Press
Year: 2020
Availability: 2 to 3 weeks

Tab Article

ReducedEffort® Changeover: The Lean Way to Quickly Reduce Changeover Downtime provides a step-by-step guide for conducting a Kaizen event that empowers the people who do the work to improve how that work is done. Packed with tips, tools, and examples, this practical guide begins with a clear description of the Lean principles underlying the ReducedEffort Changeover system. In addition, it explains how and why reducing the effort always reduces the time of converting a machine, line, or process from one product to another. In this book, you’ll find everything you need to quickly and dramatically reduce the effort and time of any process using the ReducedEffort method.

This is not another book about how to do SMED. Like SMED, ReducedEffort Changeover (REC) does reduce changeover time, but REC is not SMED.

SMED, Single Minute (or digit) Exchange of Dies, developed by Dr. Shigeo Shingo, has been the process used for many years by countless manufacturing plants to reduce changeover time. The SMED process was used in Toyota to reduce the changeover of a 1,000-ton stamping press from four hours to three minutes.

As a Lean-based process, the REC system focuses on reducing the labor, not the time, involved in changing over a machine to work on a different product. With REC, there are no Standard Operation Combination Sheets to fill out and no Problem Identification Sheets to complete, and it does not require the arduous chore of timing every task, as SMED does.

Very little capital investment is required with REC. Unlike SMED, it does not require management-approved funding to achieve substantial results. Because REC is not capital-driven, management does not need to drive the process. The operators will drive the process because it reduces their labor. One of the biggest advantages of REC over SMED is that operators will readily accept the process, and more important, they will want to sustain it. The reason for this is quite simple and will become evident when the REC process is defined. REC takes SMED to a new level that is easier and faster both to implement and to deliver sustainable results.

Tab Article

Preface
Introduction

Chapter 1 :
The Problem
Chapter 2 : Paradigms
Chapter 3 : The Lean Mentality
Chapter 4 : The Lean Approach to Zero Defects
Chapter 5 : Empowerment
Chapter 6 : ReducedEffort Changeover : The REC System
Chapter 7 : The REC Event
Chapter 8 : Tools
Chapter 9 : The REC Presentation
Chapter 10 : How to Sustain a ReducedEffort Procedure
Chapter 11 : How to Increase Innovation on the Plant Floor

Afterword
Appendix I : The Easy Way to Calculate the Cost of Downtime
Appendix II : No Tools Needed
Index
About the Author